Highway Engineering

In Highway design, CETEST has commendable achievement in providing consultancy services (Detailed Project Report) for 40 projects comprising of more than 6000 Km of roads & highways (National Highways, State Highways, PMGSY etc.) in various parts of India including foreign aided (WB, ADB, JICA etc) projects. CETEST is one of the very few consulting companies who can provide in house services of Engineering Survey, Geotechnical & Design to its clients.

Consulting Services for preparation of Detailed Project Report for Improvement of 5 important Radial Roads in Hyderabad awarded by HGCL (Job : 3084)

Project Location Hyderabad , India
Name & Address of Client Hyderabad Growth Corridor Limited
Second Floor, HMDA Complex, Tarnaka,Secunderabad-500007
Contract Value Rs. 78.62Lacs
Project Cost Rs. 800.00 Crores
Start Date August 2013
Completion Ongoing
Project Brief To enhance the urban growth of the Hyderabad city, INDIA, HGCL HYDERABAD GROWTH CORRIDOR LIMITED proposed to develop Radial roads for providing orbital linkage between outer and inner ring roads through major arterial roads, so as to facilitate smooth traffic flow and to enhance the urban growth of Hyderabad city. The radial roads are prioritized based on their potential traffic generation. To meet the project requirements, HGCL has appointed C. E. TESTING COMPANY PVT. LTD. as a consultant to prepare the Detailed Project Report for up-gradation of the 5 Radial roads with 4 Lane configurations to connect the Inner Ring Road and Outer Ring Road to meet the short term and long term improvement plan.

Consultancy Services for Feasibility and Preparation of Detailed Project Report for Improvement and Upgradation of Junctions of Ranchi Ring Road & NH-33 in the State of Jharkhand (Job : 3082)

Project Location Jharkhand
Name & Address of Client Jharkhand Accelerated Road Development Co. Ltd.
443/A, Road No.5, Ashok Nagar, Ranchi-834002
Contract Value Rs. 31.98Lacs
Project Cost Rs. 250.00 Crores
Start Date April 2013
Completion Completed
Project Brief Government of Jharkhand has initiated Jharkhand Accelerated Road Development Program (JARDP) to identify and implement, up-gradation and improvement work for important road links. Jharkhand Accelerated Road Development Company Limited (JARDCL) has decided to implement the Improvement and Up-gradations of Vikas (Junction of Ranchi Ring Road & NH-33) - Booty More - Kantatoli - Namkum Bridge (ROB) – Rampur (Junction of Ranchi Ring Road & NH33) in the State of Jharkhand.To prepare a quality Detailed Project Report which is implementable, environment friendly & socially acceptable, JARDCL has appointed C. E. Testing Company Pvt. Ltd. (CETEST) as consultant

Consultancy Services for Feasibility and Preparation of Detailed Project Report of different State Highways in Bihar ( (Job : 3028)

Project Location Bihar
Name & Address of Client Bihar State Road Development Corporation Ltd.
RCD Central Mechanical Workshop Campus
Near Patna Airport, Sheikpura, Patna-800014
Contract Value Rs. 79.30 Lacs
Project Cost Rs. 250.00 Crore
Start Date April 2013
Completion Ongoing
Project Brief Bihar State Road Development Corporation Ltd. (BSRDCL) under External funding Agency, has decided to implement the Upgradation and rehabilitation widening and strengthening scheme of SH102,Bihia NH-84 - Jagdishpur – Piro Bihta (SH-81) to 2- Lane with paved shoulder carriageway configuration from its existing road width for safe and efficient movement of traffic. To meet the requirement BSRDCL has appointed C. E. Testing Company Pvt. Ltd. (CETEST) as consultant to prepare the Detailed Project Report for the proposed improvement and up-gradation of the roadway.

Engagement as a Consultant for preparing DPR, Surveying, Soil Testing, Widening and Strengthening of Welloi-Mawkyrwat - Rangblang (L 40 Km approx.) in Meghalaya (Job : 3027)

Project Location Meghalaya
Name & Address of Client Hindustan Steelworks Construction Limited
5/1, Commissariat Road(Hastings), Kolkata - 700022
Contract Value Rs. 38.40 Lacs
Project Cost Rs. 40.00 Crores
Start Date April 2013
Completion Ongoing
Project Brief Government of Meghalaya has embarked upon up-gradation of its road network in the current plan of year 2012-2013 through Public Works Department Meghalaya. As part of this mandate, PWD Division at Mawkyrwat has decided to improve, widen and strengthen the existing road running from Weiloi – Jakrem – Mawkyrwat - Rangblang. The consultancy service for the said road has been awarded to C.E. Testing Company Pvt. Ltd. The consultancy services for the same is to include design of best possible alignment and pavement composition, design of bridges, culverts and other structures in addition to analysis of costs if any, and obtaining of all requisite clearances.

Consultancy Services for Feasibility study and Preparation of Detailed Project Report for Improvement and Up-gradation to 2-lane/2-lane with paved shoulders configuration of various State Highways and Major District Roads in Jharkhand for Package No. SHAJ/DPR/2011/06 for Dumka-Hansdiha upto Bihar Border (SH-17) Road.

Project Location Chaibasa, Jharkhand
Name & Address of Client Member (Technical), State Highways Authority of Jharkhand Govt. of Jharkhand
Contract Value Rs. 61.54 Lacs
Project Cost Rs. 286.00 Crores
Start Date February 2012
Completion Ongoing
Project Brief Project includes preparation of DPR for 52 km. of Bhagalpur Road (entire road length falling in the state of Jharkhand). While the project includes widening to 2-lane and upgradation of existing road, LAP has to be proposed for 4-lane corridor. EIA, RAP and other reports have also to be prepared as per TOR.

Consultancy Services for preparation of Detailed Project Report for Construction and Upgradation of Existing Road along Indo-Nepal Border from Km. 339.00 to Km. 452.16

Project Location Supaul/Araria, Bihar
Name & Address of Client The Chief General Manager, BSRDC Ltd., Central Mechanical Workshop Campus, Near Airport, Sheikhpura, Patna - 800 014
Contract Value Rs. 106.94 Lacs
Project Cost Rs. 270.00 Crores
Start Date January 2010
Completion September 2011
Project Brief Project includes feasibility study, preparation of RAP, EIA report including obtaining of necessary clearances including MoEF and Forest Clearance, preparation of DPR for 2-laning of Indo-Nepal Border Road for the stretch from East Bank of Koshi River from Gaira Chawk to Jogbani. Total length of the stretch is 90 km. Design of all bridges (major or minor) encountered in the roads, design of 1 no. of ROB (Road over bridge over railway lines) including design of the soans above railway lines and getting the same approved from concerned division of Indian Railways. Length of bridges encountered varies from 20m to 400m. with single span length varying from 20m to 60m.

Consultancy Services for preparation of Detailed Project Report including Soil Investigation as per technical specification, preparation of construction drawings and as-built drawings for Jamtara-Dumka and Barhat-Sahibgunj stretch in Jharkhand.

Project Location Jamtara/Sahibganj, Jharkhand
Name & Address of Client Ramky Infrastructure Ltd., Jindal Towers, Block 'A', 4th Floor, 21/1A/3, Darga Road, Kolkata - 700 017, Tel.: (033) 2289 2527/28, Fax: (033) 2289 2529
Contract Value Rs. 98.25 Lacs
Project Cost Rs. 720.50 Crores
Start Date November 2010
Completion Ongoing
Project Brief This job is being executed as the contractor's engineer and includes providing technical support to the contractor for 131km. Of SH's in the state of Jharkhand under funding from ADB. The original DPR was prepared by ICT and our job includes checking and verification of provisions made in the DPR, taking of OGL data, preparation of design drawings of deviation portions, preparation of construction drawings of all components of construction work including bridges and structures, incorporating all necessary changes as required from time to time based on site conditions, getting the same approved from SMEC (Supervision Consultant) and the owner (Jharkhand RCD) and preparation of as built drawings after completion of construction work.

Survey and Preparation of DPR for double laning of Pasighat-Pangin Road.

Project Location Pasighat, Arunachal Pradesh
Name & Address of Client Chief Engineer, Eastern Zone, PWD, Govt. of Arunachal Pradesh Itanagar, Arunachal Pradesh, Ph. - (0360) 221 2427
Contract Value Rs. 85.00 Lacs
Project Cost Rs. 201.25 Crores
Start Date June 2009
Completion August 2010
Project Brief Preparation of DPR included preparation of preliminary & detailed survey, prepararation of detailed design of roads & bridges including geometric design of road, pavement, culverts and road protection work, conduct sub-soil investigation & hydraulic studies, preparation of BOQ and estimate for 2-laning of Pasighat - Pangin Road (NH-229) from Km. 28.00 to Km. 76.00 (Length - 48 kms.) including bypass (new alignment) from Km. 42.00 to Km. 60.00 (Length 18.00 km.) under Trans Arunachal Package of Roads. To remain associated with the department during the execution of road. Length of bridges varies from 15m to 120m. The DPR's was approved from MOSRT & H.

Consultancy Services for Preparation of Detailed project Report for 4-laning of Buddhist Circuit - Gaya-Hisua-Rajgir-Nalanda-Bihar Sharif (NH-82).

Project Location Gaya, Bihar
Name & Address of Client Chief Engineer (NH Wing), Road Construction Department, Govt. of Bihar, Vishveshwaraiya Bhawan, Bailey Road, Patna, Bihar
Contract Value Rs. 78.85 Lacs
Project Cost Rs. 1097.40 Crores
Start Date February 2009
Completion June 2011
Project Brief Project includes feasibility study and preparation of DPR for 4-laning of Budhhist Circuit of NH - 82 from Gaya to Bihar Sharif (Total Length - 95.00 Km.). Though acting as the other partner of the JV, main execution of the project is being done by CETEST with a share of 86.5% of the turnover. Job includes design of all bridges (major or minor) encountered in the roads. The project includes widening from 2-lane to 4-lane divided carriageway for a length of 83.00 km. and new alignment (bypass) including proposing of bypass for a length of 12 kms. (total 4 nos. of bypasses). Length of bridges/grade separators on this road varies 20m. to 550m. Single span length varies from 15m to 40m. All bridges/grade separators/ROB are for 4-lane and they are located on widening part of the road.

Consultancy Services for Preparation of Detailed project Report for ADB Phase-II Roads, Package - I, North Bihar.

Project Location Bihar
Name & Address of Client Chief Engineer (Project Management Unit), Road Construction Department, Govt. of Bihar, Vishveshwaraiya Bhawan, Bailey Road, Patna, Bihar
Contract Value Rs. 349.10 Lacs
Project Cost Rs. 2432.25 Crores
Start Date February 2009
Completion July 2010
Project Brief Project includes feasibility study and preparation of DPR for 2-laning of 6 nos. State Highway in North Bihar funded by ADB. Total length of all the SHs combined adds upto 422.82 kms. Though acting as the other partner of the JV, main execution of the project is being done by CETEST with a share of 86.5% of the turnover. The project includes widening of MDRs to 2-lane State Highways. Most of the roads are for widening portions except for some stretches which are being proposed as bypasses. Job includes design of all bridges (major or minor) encountered in the roads. Bridges are being design and length of bridges encountered so far varies from 20m to 84m. with single span length varying from 20m to 24m. All bridges are located on 2-lane State Highways and are proposed on widening portions.