CETEST has completed more than 50 projects in Bridge Design in the last 10 years for National Highway, State Highway and Other Roads etc in the different states of India. We have the experience of design completion of more than 550 Major & Minor Bridges of different types.

Consultancy Services for preparation of detailed project report for construction of bridges (construction of HLB across river Krishna connecting Somasila in Mahaboobnagar district & Siddeswaram in Kurnool district) in Telangana State (Package III). Ref.: 3549

Project Location Telangana, India
Name & Address of Client Roads & Buildings Department
Government of Telangana, Errumanzil, Hyderabad.
Contract Value Rs. 112.29 Lacs
Project Cost Rs. 270.00 Crore
Start Date Jan 2015
Completion May 2017
Project Brief Preparation of DPR for 2-Lane bridge over river Krishna that will connect Somasila (Mahaboobnagar, Telangana) and Siddeswaram (Kurnool, Andhra Pradesh) including the approaches. The Bridge is unique in nature with 728m continuous and integral with total length of 1828m with the configuration of (6x50m + 64m + 5x120m + 64m + 16x50m). The height of Bed Level to top of road is about 40m. The foundations are RCC Bored Pile of 2500mm diameter. The advantage of large Pier height was taken through continuity. The major site work challenge was Geotechnical Study in the submerged and River during monsoon. The approach road of the bridge is in the Hilly Terrain.

Architectural and Structural Design for Signature Foot Over Bridge with Escalator / Under Pass as per feasibility near Patna Zoo and Ashoka Convension Centre, Gandhi Maidan, Patna. Ref.: 4343

Project Location Bihar, India
Name & Address of Client Bihar Rajya Pul Nirman Nigam Ltd.
7, Sardar Patel Marg, Patna – 800 015.
Contract Value Rs. 43.22 Lacs
Project Cost In Progress
Start Date Aug 2019
Completion Ongoing
Project Brief CETEST has been awarded a prestigious project by BRPNNL to prepare a DPR for the proposed construction of an Elevated Corridor at near Patna Zoo and Ashoka Convention Centre, Gandhi Maidan, Patna.

Consultancy Services for Preparation of a Detailed Project Report of the proposed construction of a Flyover at Amberpet road, Hyderabad. Ref.: 3155

Project Location Hyderabad, India
Name & Address of Client Greater Hyderabad Municipal Corporation
6th Floor, C.C. Complex, Tank Bund Road, Hyderabad.
Contract Value Rs. 60.30 Lacs
Project Cost Rs. 410.00 Crore
Start Date Dec 2013
Completion Apr 2017
Project Brief CETEST has been awarded a prestigious project by GHMC to prepare a DPR for the proposed construction of a flyover at Amberpet Road, Hyderabad, India. National Highway NH-202; Lane = 4-Lane Flyover Length (Total = 1465m, Structural Length = 1228m, RE Wall Length = 187m, Retaining wall = 50m) Max Span = 35m; Span Arrangement = 2x4m + 28x35m + 8x30m

Preparation of Detailed Project Report for Flyover from Gopalganj more to Tarwara more in the town of Siwan District Siwan, Bihar along with Feasibility Study & PPR. Ref.: 4213

Project Location Bihar, India
Name & Address of Client Bihar Rajya Pul Nirman Nigam Ltd.
7, Sardar Patel Marg, Patna – 800 015.
Contract Value Rs. 124.57 Lacs
Project Cost Rs. 160.00 Crore
Start Date Aug 2018
Completion Nov 2018
Project Brief CETEST has been awarded a prestigious project by BRPNNL to prepare a DPR for the proposed construction of an Elevated Corridor from Gopalganj more to Tarwara more in the town of Siwan District Siwan, Bihar along with Feasibility Study & PPR.
Flyover / Elevated Corridor Length = 2.2 Km, Lane = 2-Lane (11m width)

Consultancy Services for preparation of Detailed Project Report for "Construction of RCC bridge over river Yei at Kiphire in the state of Nagaland. Ref.4347

Project Location Nagaland, India
Name & Address of Client Public Works Department (NH)
Govt. of Nagaland, Nagaland, Kohima
Contract Value Rs. 29.50 Lacs
Project Cost Rs. 75.00 Crores
Start Date Sept 2019
Completion May 2020
Project Brief Preparation of Detailed Project Report for RCC bridge over river Yei at Kiphire in the state of Nagaland.
Bridge Length: 325m
  • Span Arrangement: 3x25m + (60m + 130m + 60m)
  • Bridge Type: RCC T-Girder & PSC (Balanced Cantilever Construction)
  • Maximum pier Height: 66m
  • Pier type: Hollow Pier, • Foundation: Pile Foundation
  • Consultancy Services for preparation of a feasibility report and PPR/DPR with bidding document for Comprehensive Development of Aramgarh to Muslimjung Bridge Corridor as Conflict Corridor in Greater Hyderabad Municipal Corporation (GHMC) Limits, Telangana State. Name of Road : Aramgarh - Bahadurpura - Muslimjung Bridge.(Pkg-5) Ref.: 3534

    Project Location Hyderabad, Telengana, India
    Name & Address of Client Greater Hyderabad Municipal Corporation.
    6th Floor, C C Complex, Tank Bund Road, Hyderabad.
    Contract Value Rs. 29.96 Lacs
    Project Cost Rs. 348.00 Crores
    Start Date June 2015
    Completion June 2018
    Project Brief The objective is to design & develop Conflict Free Corridor in order to improve the overall traffic mobility substantially increasing the speed of long distance traffic without occurrence of accidents. The major part was junction improvements as Grade Separators (Flyovers) and At-Grade Solutions. Name of Road: Aramgarh - Bahadurpura - Muslimjung Bridge.
    Main Corridor
  • Lane = 6-lane, Formation Width = 23m
  • Total Improvement length = 4058m
  • Length of 6-lane flyover / structure = 3788m
  • Type = PSC I Girder
  • Maximum span = 35m
  • Span Arrangement = 126x30m+2x4m
  • Length of RE Wall = 270m
  • Consultancy Services for preparation of a feasibility report and PPR/DPR with bidding document for Comprehensive Development of NFCL Junction to Sangeeth Junction Corridor in Greater Hyderabad Municipal Corporation (GHMC) Limits, Telangana State. Ref.:3535

    Project Location Hyderabad, Telengana, India
    Name & Address of Client Greater Hyderabad Municipal Corporation.
    6th Floor, C C Complex, Tank Bund Road, Hyderabad.
    Contract Value Rs. 39.92 Lacs
    Project Cost Rs. 340.00 Crores
    Start Date July 2015
    Completion June 2018
    Project Brief The objective is to design & develop Conflict Free Corridor in order to improve the overall traffic mobility substantially increasing the speed of long distance traffic without occurrence of accidents. The major part was junction improvements as Grade Separators (Flyovers) and At-Grade Solutions.
    Name of Road: NFCL Junction - Punjagutta - Begunpet - Harihara Kala Bhavan - Sangeeth Junction.
    Road Length = 7.7 Km, 4/6-Lane, Urban Road
    Flyover = 8 Nos., Underpass = 4 nos., VUP = 4 nos.