Projects Surveying
In the past 10 years, CETEST has completed more than 1000 jobs for various engineering surveys like Topographical, Hydrographical & Route Surveying with the use of state-of-art equipments like DGPS, Hand GPS, Total Station & Digital Levels.
Final location survey and land survey including preparation of detailed plan and section with land plan and detailed estimate between New Bangaigaon to Kamakhya via Goalpara (176.0 KM) in connection with doubling of existing BG Line from NBQ to KYQ via GLPL. Ref. 3713
|
Project Location |
Assam, India |
Name & Address of Client |
Northeast Frontier Railway Maligaon, Guwahati. |
Contract Value |
Rs. 568.51 Lacs |
Start Date |
May 2016 |
Completion |
Aug 2018 |
Project Brief |
The objective is to design & detailed plan and section with land plan and detailed estimate, pegging of alignment in connection with doubling of existing BG Line.
Length = 182 Km, Existing BG Line.
Final Location Survey / Staking out of alignment
Geological & Geotechnical Investigation
|
Topographical Survey, Bathymatric Survey and Geotechnical Investigation, at 3x800 MW PVUNL, Patratu STTP, Jharkhand. Ref.: 4099
|
Project Location |
Patratu STTP, Jharkhand, India |
Name & Address of Client |
Bharat Heavy Electricals Limited Western Region, Shreemohini Complex, 345, Kingsway, Nagpur. |
Contract Value |
Rs. 187.16 Lacs |
Start Date |
Jan 2018 |
Completion |
Nov 2019 |
Project Brief |
Topographic survey by Total Station, fixing ground control points by DGPS, showing all existing features like, building, roads, culvert, bridges, nallah, tree etc. Taking cross section of roads, nallah and spot level for contour including preparation of contour drawing. |
Final location / pre-construction survey for new BG single Railway line alignment (25.00 km) including stacking of alignment on ground, geological and geotechnical investigation, preparation of detailed estimate, drawing and ancillary works in connection with construction of BG Line between Tezpur to Silghat (Assam) Ref.: 4019
|
Project Location |
Assam, India. |
Name & Address of Client |
North-East Frontier Railway Dy. Chief Engineer / Con-II, Maligaon, Guwahati -11 |
Contract Value |
Rs. 74.20 Lacs |
Start Date |
July 2017 |
Completion |
Oct 2018 |
Project Brief |
Final location / pre-construction survey for new BG single Railway line alignment (25.00 km) including stacking of alignment on ground, geological and geotechnical investigation, preparation of detailed estimate, drawing and ancillary works in connection with construction of BG Line between Tezpur to Silghat (Assam)
Final Location Survey = 25 Km
Drone / Aerial Documentation Videography Survey for New BG Alignment from Tezpur – Silghat = 27Km
|
Consultancy Services for preparation of Detailed Project Report (DPR) for two Bridges over River Brahmaputra connecting Panbazar to North Guwahati & Palashbari to Sualkuchi – Geotechnical Investigation & Topographical Survey. Ref.: 3935
|
Project Location |
Guwahati, Assam, India |
Name & Address of Client |
SMEC India Pvt. Ltd. 387, Udyog Vihar, Phase-2, Gurgaon, India, 122016. |
Contract Value |
Rs. 250.83 Lacs |
Start Date |
Mar 2017 |
Completion |
Dec 2018 |
Project Brief |
Hydrological Survey by Echo Sounder & Topographic survey by Total Station, fixing ground control points by DGPS, showing all existing features like, building, roads, culvert, bridges, nallah, tree etc. Taking cross section of roads, nallah and spot level for contour including preparation of contour drawing. |
Urban Water Supply Scheme at Dharmanagar/ Remodeling of existing pipeline Distribution Network within Dharmanagar Nagar Panchayet/ Survey work for Topographical and contour survey. Length = 130 Km. Ref.: 3238
|
Project Location |
Beheragoda to Keonjhar, Orissa. |
Name & Address of Client |
Drinking Water & Sanitation, Govt. of Tripura Sub-Division Dharmanagar, North Tripura |
Contract Value |
Rs.8.76 Lacs. |
Start Date |
July 2014 |
Completion |
Sept 2014 |
Project Brief |
Fixing control point by DGPS, detailed survey by Total Station, bench mark carry by digital Auto Level, taking long section, cross section and preparation of survey drawing (plan & profile) showing all existing features and contour, Location and levels of treatment plant, Capacity of existing overhead reservoirs including R.L. at ground level and staging height etc. |